engineering recuitment PGCIL Trainee Supervisor Electrical Mock Test 2024 Power Systems Economies of Power Generation
A generating station produces 61.5 Mega Units per annum. It is connected to a load of 50 MW and its maximum demand of 20 MW. Determine the demand factor of the station.
1
0.4
2
0.5
3
0.6
4
0.2