engineering recuitment MP Vyapam Sub Engineer Mock Test 2024 Environmental Engineering Design of Sewer
A _________ is established parallel to the sewer centre line at a distance that will not disturb and covered excavated material during Setting out of Sewer Centre Line.
1
bracing
2
offset line
3
sewer center line
4
trench edge line