In a sand casting process, a sprue of height 200 mm and 10 mm base diameter leads to a runner which fills a cubical mould cavity of 200 mm side. Time required to fill the cavity will be: [discharge coefficient = 1, g = 10 m/s2]

1
560/11 sec
2
460/11 sec
3
360/11 sec
4
260/11 sec