engineering recuitment OSSC Soil Conservation Extension Worker - CHSL Mock Test Series 2024 Quantitative Aptitude Average
There were five continuous days of rainfall in Bhubaneswar. The average rainfall of the first four days and the last four days was 40 cm and 45 cm respectively. What is the difference between the minimum possible and maximum possible average rainfall of all the five days?
1
2.0 cm
2
2.5 cm
3
3.0 cm
4
3.5 cm
5
4.0 cm