The slope of a 1.0 m diameter concrete sewer laid at a slope of 1 in 1000, develops a velocity of 1 m/s when flowing full. When it is flowing half-full, the velocity of flow through the sewer will be:

1
0.5 m/s
2
1.0 m/s
3
 2.0m/s
4
4.0 m/s