railway RRB JE (CBT I + CBT II) Mock Test 2024 Control Systems Frequency Response Analysis Bode Plot
If the given system is connected to a unity negative feedback system, the steady-state error of a closed-loop system to a ramp input is;
1
0.01
2
1
3
0.5
4
0.2