The construction of impounding reservoir is required when:
1
average annual flow in the stream is lower than average demand
2
the rate of flow in the stream is equal to the demand
3
the rate of flow in the stream, in dry season is more than the demand
4
the rate of flow in the stream, in dry season is less than the demand