railway RRB JE (CBT I + CBT II) Mock Test 2024 Refrigeration and Air Conditioning Refrigeration Cycles and Devices Vapour Compression (V-C) Cycle
In a vapour compression refrigeration system, if liquid heat at temperature ‘T1’ and ‘T2’ are 100 kJ/kg and 25 kJ/kg respectively and the dryness fraction at ‘a’ is 0.5, find Latent Heat of refrigerant.
1
200 kJ/kg
2
300 kJ/kg
3
150 kJ/kg
4
350 kJ/kg