An electric load consumes 17.32 kW at a power factor of 0.707 (lagging). For changing the load power factor to 0.866 (lagging), the capacitor that is to be connected in parallel with the load, should draw

1
7.32 KVAR
2
10 KVAR
3
27.32 KVAR
4
10.32 KVAR