A trapezoidal canal with a bottom width of 6 m, a depth of 2 m, having a side slope of 2: 1 (Horizontal: Vertical) is formed in cutting for a length of 1 km. The volume of earthwork to be excavated in forming the canal for the length of 1 km is:
1
14600 m3
2
16000 m3
3
28000 m3
4
20000 m3