A swimming pool is fitted with 3 pipes A, B, C to fill the pool. A and B together can fill the pool in half the time that is required for C to fill the pool. B takes 20 hours more than the time required for A and 14 hours more than the time required for C to fill the pool. Then the time (in hours) required for all the 3 pipes together to fill the pool is
1
7
2
15
3
18
4
12